GRS Railway Objective Questions General Rules of Signals
1. Approved special instructions are issued or approved by (C)
______________.
(A) COM (B)DRM
(C)CRS (D)Sr DOM
2. Special instructions are issued by ______________________. (A)
(A).Authorized Officer (B).Controlling officer
(C).Supervisor in charge (D).All the above
3. _____________________ is the authorized officer of South
Central Railway. (B)
(A).CRS (B) COM
(C).DRM (D).CSO
4. ______________________________ is the normal authority to
proceed on Single Line token / token less sections. (C)
(A).Starting Memo (B).T/409
(C). TOKEN/OFF ASPECT OF LSS (D). None 5. On Double
line or on Single Line when block instrument is defective
____________ is given as ATP for the LP. (D)
(A).T/A 912 (B).T/511 (C).T/512
(D). T/C-D 1425
6. Block stations under Absolute Block System are sub-classified as ___________,
____________, _____________ &
_______________. (C)
(A).FLAG , CROSSING,NON CROSSING ,RUN THROUGH
(B).REPORTING,NON REPORING ,CLASSIFIED,UNCLSSSIFIED
(C). CLASS A,B,C&D
(D). ALL OF THE ABOVE
7. BOL in TAS and MAS is _________ and ___________ meters,
which shall be reckoned from _______________. (B)
(A).200-180-LSS (B).400 -180-FSS
(C).120-120-LSS (D).200-180 -FSS
8. SOL in TAS and MAS is ___________ and ________ meters. (C)
(A). 120-120 (B).400-180
(C).180-120 (D).180-180
9. SOL is measured on Single Line from ______________ and on
Double Line from_________________. (A)
(A). Trailing Points-Shunting Limit Board
(B).BSLB-SLB (C).Trailing Points -BSLB
(D). LB-PB
10. The distance from outer signal to outermost facing points on SL shall be
_________meters. (C)
(A).400 (B).420
(C).580 (D).800
11. The distance from Home signal to BSLB shall not be less than ________ (A)
meters.
(A).180 (B).120
(C).400 (D).580
12. At Standard-I (R) interlocking station the maximum speed (B)
permitted for the train on ML is not more than __________ kmph.
(A).15 (B).50
(C).75 (D).MPS
13. At Standard-III (R) interlocking station the maximum speed
permitted for the train on ML is above __________ kmph. (C)
(A) 15 (B) 50
(C) 140 (D) MPS
14. The maximum speed permitted on loop line is _______ kmph. (B)
(A) 15/25 (B) 15/30
(C) 8/10 (D) 10/15
15. Isolation is necessary where the trains are permitted to go above (B)
_________ kmph at a station.
(A) 15 (B) 50
(C) 75 (D) MPS
16. ________________ is the best positive method of isolation. (D)
(A) Cut Point (B) Catch Siding
(C) Slip Siding (D) Sand Hump
17. Point indicator, wherever available shall show _________ (B)
during day and __________ light during night when point is set
for Main line .
(A) Red Target-Red (B) White Target-White
(C) Green Target-Green (D) No Target-Green
18. Point indicator, wherever available shall show ___________ (D)
during day and __________ light during night when point is set
for Loop line.
(A) White Target-White (B) Green Target - Green
(C) No Target - White (D) No Target - Green
19. When Trap indicator is provided, it shall show ___________ (B)
during day and ________ light during when it is in open position
(A) White Disc - White (B) Red Disc - Red
(C) No Target - White (D) None of the above
20. Station limits are available between _______________ signals at a Block (B)
Station.
(A) Inner Most (B) Outer Most
(C) Home (D) LSS
0 Comments
You can give your Suggestions and feedback here